Friday, 18 September 2020

Anna University Update Online Exam Instructions Do's & Don't

 

Anna University Official Notification Website Link 

 https://www.annauniv.edu/pdf/Candidate%20User%20Manual-UD%20(1).pdf



Do‘s

Don’t

1.        If you are using any one of the devices such as Laptop / Smart Phone / Tablet / Desktop, charge the device well in advance to last for at least 2 hours.

2.        Check the power plugs / electrical connectivity.

3.        Do ensure that proper internet connectivity is available for your devices.

4.        Student to be seated using a wall as a background (preferred).

5.        Do ensure proper lighting in the room where you are taking up the examination.

6.        Students must have the identity proof / any government authorized ID card ready at the time of examination.

7.        Do ensure that the Webcam and Microphone of Laptop / Smart Phone / Tablet / The desktop is working properly during the examination.

8.        Do ensure that the webcam focus is on your face and is clearly visible in the video bubble.

9.        Do ensure silence in the place/room from where you are appearing for the examination.

10.    Do capture your photo (for Photo Identity) before the start of the examination. Ensure there are no objects behind you. Photograph clicked must be of good quality.

11.    Do wear transparent and non-reflecting glasses/lenses, if needed.

12.    Keep a transparent water bottle at your table before the start of the examination, if need be, as you are not allowed to move away from the examination screen during the examination.

13.    Use the scientific calculator available onscreen by clicking the “Resources” button.

14.    Login ONLY after 3 minutes to resume your examination in case of any interruptions.

15.    Do appear for the Mock/dry run examination (schedule will be announced shortly) with the login ID and password provided to you to familiarize with the examination experience. The mock examination is mandatory, and it will give confidence for a student to comfortably appear for the terminal semester online examinations.

16.    The students are expected to be available for the entire duration of the examination. 

 

17.    Do not try to navigate from the main screen. Doing so will automatically terminate your examination.

18.    Do not talk to anyone/refer to any material while your examination is in progress as real-time monitoring is being done by the proctor in the University. Doing such activities may lead to cancellation of your examinations.

19.    You are advised not to use the keyboard while you are attempting the examination; you are only allowed to scroll the cursor with the mouse to answer the question.

20.    You are not allowed to start the an examination from multiple devices at a time. 

21.    Do not leave your place for any reason during the examination.

22.    Do not have any light source behind your face.

23.    Do not cover your face with Hair, clothing (mask), hands or anything else.

24.    Do not use headphones, ear-buds, or any other type of listening equipment.

25.    Do not have any background noise/voices/music or Television.

26.    Do not wear sunglasses during the examination.

27.    Do not entertain any other people in the room.

28.    Do not communicate with any person by any means during the examination.

29.    Do not have any programs or applications like MS Teams, Zoom, GoogleMeet, etc. that use the webcam, microphone & screen-share during the examination.

 


Saturday, 12 September 2020

TQM MCQ Queations

GE6757 TOTAL QUALITY MANAGEMENT  

MCQ QUESTIONS  

 

 

1-Malcolm Baldrige national quality award is for (MBNQA) 

a. Total Quality Management 

b. International Standard Organization 

c. Total Productive Maintenance 

d. Total Quality Control (Ans:a) 

 

2-The process mapping is a ______ diagram. 

a. Data flow 

b. Work flow 

c. Circular 

d. Audit (Ans:b) 

  

3-Control chart is a 

a. Process monitoring tool 

b. Process control tool 

c. Both (a) and (b) 

d. None of the above (Ans:c) 

  

4-The objective of ISO-9000 family of Quality management is 

a. Customer satisfaction 

b. Employee satisfaction 

c. Skill enhancement 

d. Environmental issues (Ans:a) 

  

5-Total Quality Management (TQM) focuses on 

a. Employee 

b. Customer 

c. Both (a) and (b) 

d. None of the above (Ans:c)  

  

6-Which of the following is responsible for quality objective? 

a. Top level management 

b. Middle level management 

c. Frontline management 

d. All of the above (Ans:a) 

  

7-The following is (are) the machine down time. 

a. Waste 

b. No material 

c. Breakdown 

d. All of the above (Ans:d) 

  

8-TQM & ISO both focuses on 

a. Customer 

b. Employee 

c. Supplier 

d. All of the above 

(Ans:a) 

 

9-According to Deming, Quality problems are 

a. Due to management 

b. Due to method 

c. Due to machine 

d. Due to material 

(Ans:a) 

 

10-While setting Quality objective, ________ to be considered. 

a. Material quality 

b. Customer need 

c. Market demand 

d. All of the above 

(Ans:b) 

 

 

11-Match The Following 

A. TQM promotes 1. Small change 

B. Kaizen is 2. Continuous improvement 

C. Quality circle can solve problem related to 3. Employee participation 

D. Quality circle benefit to 4. Employee 

The correct order is 

The correct order is 

a. A-3, B-1, C-2, D-4 

b. A-1, B-3, C-2, D-4 

c. A-3, B-1, C-4, D-2 

d. A-3, B-2, C-1, D-4 

(Ans:a) 

  

12-_______ helps organization reduce employee turnover and absenteeism. 

a. Job design 

b. Training & development 

c. Wage revision 

d. All of the above (Ans:b) 

  

13-CMM stands for 

a. Capability maturity model 

b. Capability monitoring model 

c. Capability measuring model 

d. Capability matching model (Ans:a) 

  

14-While setting Quality objective, ________ to be considered. 

a. Customer need 

b. Organizational need 

c. Supplier need 

d. Worker need (Ans:a) 

 

15-Which of the following is for Environment management? 

a. ISO-9000 

b. ISO-14000 

c. ISO-26000 

d. ISO-31000 

(Ans:b) 

 

 

Set 2 

 

-P-D-C-A stands for 

a. Plan-Do-check-Act 

b. Plan-Do-correct-Act 

c. Proceed-Do-check-Act 

d. Proceed-Do-correct-Act (Ans:a) 

  

2-What is ISO? 

a. Indian organization for standard 

b. Internal organization for standard 

c. International organization for standard 

d. None of the above 

(Ans:c) 

 

3-EMS stands for 

a. Environmental management system 

b. Employees management system 

c. Engineering management system 

d. Equipment management system 

(Ans:a) 

  

4-For Cpk (Process capability index) value of 1.33, the PPM is 

a. 1 

b. 63 

c. 2700 

d. 45500 (Ans:b) 

  

5-Match The Following 

 

c. A-2, B-3, C-4, D-1 

d. A-4, B-3, C-1, D-2 (Ans:b) 

  

6-Match the following 

 

c. A-2, B-3, C-1, D-4 

d. A-4, B-3, C-1, D-2 

(Ans:c) 

  

7-Rectangle represents ________ While plotting flow chart. 

a. Step in activity 

b. Decision making 

c. Direction of flow 

d. None of the above 

(Ans:a) 

 

8- Tally chart is 

a. Process monitoring tool 

b. Data collection tool 

c. Process planning tool 

d. None of the above (Ans:b) 

  

9-Diamond represents ________ while plotting flow chart. 

a. Step in activity 

b. Decision making 

c. Direction of flow 

d. None of the above (Ans:b) 

  

10-The role of management is to 

a. provide Resources 

b. define EMS 

c. monitor the effectiveness of the system 

d. All of the above 

(Ans:d) 

 

11-ISO emphasis on 

a. Prevention 

b. Inspection 

c. Rejection 

d. All of the above (Ans:a) 

  

12- ISO – 14001 gives stress on 

a. Plan – Do -check -Act 

b. Environmental protection 

c. Prevention rather than detection 

d. All of the above (Ans:d) 

  

13- Service Assurance is 

a. Confidence with customer 

b. Customer has trust 

c. Employee has knowledge 

d. All of the above 

(Ans:d) 

  

14- Following is (are) the phase(s) of intervention 

a. Formulation stage 

b. Maintenance stage 

c. Implementation stage 

d. All of the above (Ans:d) 

  

15- When cpk is less than one 

a. Process is not capable 

b. Process is stable 

c. Process if highly capable 

d. None of the above 

(Ans:a) 

 

 

Set 3 

1-Match the following 

 

c. A-4, B-3, C-2, D-1 

d. A-4, B-2, C-3, D-1 

(Ans:c) 

 

2-Match the following 

A. Dimension 1. To assess 

customer 

satisfaction level 

B. Service characteristic 2. Vary from time to time 

 

 

c. A-3, B-2, C-4, D-1 

d. A-3, B-1, C-2, D-4 

(Ans:) 

3-Match the following 

 

c. A-4, B-3, C-2, D-1 

d. A-3, B-4, C-2, D-1 

(Ans:c) 

 

4-Match the following 

 

b. A-1, B-2, C-4, D-3 

c. A-2, B-1, C-3, D-4 

d. A-2, B-4, C-1, D-3 

(Ans:a) 

 

5-Match the following 

A. How TQM helps in reducing cost 1. By reducing external sale 

B. Calibration activity carried in company is 2. Prevention cost 

C. Quality planning is 3. Appraisal cost 

D. Vender assessment is 4. Appraisal cost 

 

The correct order is 

a. A-4, B-1, C-2, D-3 

b. A-1, B-4, C-3, D-2 

c. A-1, B-2, C-4, D-3 

d. A-1, B-4, C-2, D-3 

(Ans:d) 

 

6-Match the following 

 

b. A-1, B-2, C-4, D-3 

c. A-2, B-1, C-3, D-4 

d. A-2, B-4, C-1, D-3 

(Ans:a) 

7-Match the following 

 

c. A-1, B-3, C-2, D-4 

d. A-3, B-1, C-4, D-2 

(Ans:b) 

 

8-Match the following 

 

c. A-4, B-3, C-1, D-2 

d. A-3, B-4, C-1, D-2 

(Ans:c) 

 

9-Match the following 

A. Forecasts 1. Systematic analysis of work 

B. Estimate made by management 2. Simplest method of assessment 

 

 

c. A-2, B-3, C-4, D-1 

d. A-3, B-4, C-2, D-1 

(Ans:a) 

  

10-Match the following 

A. Process is managed 

level 1. Process capability 

B. Critical process maturity  concept include 2. Performance is model 

C. Managed level of process 3. Capability maturity 

D. CMM is 4. Process is controlled 

 

a. A-2, B-4, C-1, D-3 

b. A-2, B-1, C-3, D-4 

c. A-2, B-1, C-4, D-3 

d. A-1, B-2, C-4, D-3 

(Ans:c) 

  

11-Match the following 

A. Simulated decision games 1. Unstructured group interaction 

B. Coaching 2. Acting out managerial problems 

C. Committee assignment 3. Guidance through advice / suggestions 

 

c. A-2, B-3, C-4, D-1 

d. A-3, B-2, C-4, D-1 

(Ans:c) 

 

 

c. A-3, B-4, C-2, D-1 

d. A-3, B-2, C-4, D-1 

(Ans:) 

 


Friday, 11 September 2020

How to update Mobile Number & Email in COE1.annauniv.edu?

 Today, Anna University published a new announcement in coe1.annauniv.edu student portal. In the announcement, Anna University requested students to update the currently active mobile number and email id for the final semester examination.


How to update Mobile Number & Email in COE1.annauniv.edu?

  1. Visit this https://coe1.annauniv.edu/home/index.php 
  2. Enter Reg Number, DOB & Captcha to login

  3. Go to the Registration Preview section & Enter current active Mobile Number & Email ID. 

  4. After filling up the details you will get a confirmation page like this 
      THANKS FOR READING 
google-site-verification: google18ae80885fc3d876.html